The Abu Tubul Block 60 project was developed by the Oman Oil Company Exploration & Production LLC (OOCEP) for the Abu Tubul Field.
The project scope included 60 wells drilled and connected with flow, gathering, and export pipelines leading into a newly built gas processing plant at Abu Tubul.
Canusa-CPS successfully deployed the patented IntelliCOAT™ system, which automates the installation of our Factory Grade GTS-PE (3LPE) and GTS-PP (3LPP). For consistent end-to-end performance on-site, Canusa-CPS was subcontracted for both the supply of material, and provision of trained and experienced Field Service Engineers for the duration of the project to operate the IntelliCOAT™ system.