Factory Grade™ GTS-PP & GTS-PE applied by IntelliCOAT™

The Abu Tubul Block 60 project was developed by the Oman Oil Company Exploration & Production LLC (OOCEP) for the Abu Tubul Field.

The project scope included 60 wells drilled and connected with flow, gathering, and export pipelines leading into a newly built gas processing plant at Abu Tubul.

Canusa-CPS successfully deployed the patented IntelliCOAT™ system, which automates the installation of our Factory Grade GTS-PE (3LPE) and GTS-PP (3LPP). For consistent end-to-end performance on-site, Canusa-CPS was subcontracted for both the supply of material, and provision of trained and experienced Field Service Engineers for the duration of the project to operate the IntelliCOAT™ system.

Project Name
Abu Tubul Block 60
Date
2012 - 2015
Market
Onshore, Oil and Gas
Location
Sultanate of Oman
Scope
Export Lines, 70 kms of 8” and 16” ; Gathering Lines,100 kms of 4” to 8"
Diameter
4” to 8”, 16"
Product
GTS-PP and GTS-PE, installed using IntelliCOAT™