Bisat reservoir has proven to be larger than initially expected. The oil export system currently consists of 8”, 32 km – Bisat to GPP pipeline and 8”, 85 km – GPP to MOL pipeline.
A concept selection study was conducted to evaluate the expansion of Block-60 Oil Export Pipeline system, identify the bottlenecks, operability and maintainability of the complete system and recommend a suitable pipeline with a maximum production of 75000 SBPD.
After the study it was recommended to install a 16” pipeline from Bisat to Yibal to enhance the oil export capacity.
The total pipeline scope of work included a 16” OD pipe with 7,180 joints which were protected with Canusa-CPS’s – GTS-PP – heat shrink sleeve solution.
Known for our product performance, ease-of-installation and project excellence, Canusa-CPS was selected on a short notice to propose an effective product for use on this project.